Site selection
Site selection (Every Building): Sun orientation, topographic relief, scaleof adjacent buildings, location of trees and plants, landscaping, avoid erosion surfaces, and area prone to fire.
Next to flood lines 1 ft above and 100 ft away
Be next to public transportation
Flood Plain: Very limited construction: Agricultural or recreation, build only above flood plain, 100 year storm.
Notify Architect: When unknown object are uncovered during construction
CSI Specifications: Security steel gate is In section 10 for Specialties not doors, or metals, or equipments.
Site Preparation: Site clearing, Removal top soil, rough grading, then finish grading.
Environmental
Environmental impact considered site analysis: Reflection, air movement, and sun & shadow patterns. “Not” archeological finds
Development potential of parcel: Verify these issues: wetland/ endangered species/ hazardous waste. Not: acid rain has nothing be controlled.
After “sight” what other senses is important: hearing. “Not”: Touch, smell, taste
To remove noise: best way increase distance to receiver
Sorry, the comment form is closed at this time.