Requirements II

 

OPTION 1: Flush-Out

PATH 1: Post-construction and pre-occupancy, install new filtration media and flush-out building by supplying a total air volume of 12,000 cubic feet of outdoor air per square foot of floor space with a minimum internal temperature of 60 degrees Fahrenheit (F) and a maximum humidity of 60%. OR