Greenerade

  • Downloads
  • Forum
  • Links
  • Saum’s Blog
  • LEED
    • Energy and Atmosphere Models
      • Energy and Atmosphere EA C3
        • Intent or Credit
        • Requirements
          • Requirements 2
          • Requirements 3
        • Strategy
          • Strategy 2
        • Submittal Documentation
          • Submittal Documentation Continued
      • Energy and Atmosphere Table: EA P1
        • Intent or Credit
          • Intent or Credit II
        • Requirements
          • Requirements 3
          • Requirements 4
          • Requirements 5
          • Requirements 6
          • Requirements 7
        • Strategy
          • Strategy 2
          • Strategy 3
          • Strategy 4
          • Strategy 5
        • Submittal Documentation
          • Submittal Documentation Continued
      • Energy and Atmosphere: EA C1
        • Standard
          • Intent or Credit
          • Requirements
            • Requirements 2
            • Requirements 3
            • Requirements 4
          • Strategy
            • Strategy 2
            • Strategy 3
          • Submittal Documentation
      • Energy and Atmosphere: EA C2
        • Standard
          • Intent or Credit
          • Requirements
            • Requirements 2
            • Requirements 3
          • Strategy
            • Strategy 2
            • Strategy 3
          • Submittal Documentation
      • Energy and Atmosphere: EA C4
        • Standard
          • Intent or Credit
          • Requirements
            • Requirements 2
          • Strategy
            • Strategy 2
            • Strategy 3
          • Submittal Documentation
            • Submittal Documentation Continued
      • Energy and Atmosphere: EA C5
        • Intent or Credit
        • Requirements
          • Requirements 2
          • Requirements 3
        • Strategy
          • Strategy 2
        • Submittal Documentation
          • Submittal Documentation Continued
      • Energy and Atmosphere: EA C6
        • Standard
          • Intent or Credit
          • Requirements
            • Requirements 2
            • Requirements 3
            • Requirements 4
          • Strategy
            • Strategy 2
          • Submittal Documentation
            • Submittal Documentation 2
            • Submittal Documentation 3
      • Energy and Atmosphere: EA P2
        • Standard
          • Intent or Credit
          • Requirements
            • Requirements 2
            • Requirements 3
            • Requirements 4
          • Strategy
            • Strategy 2
          • Submittal Documentation
      • Energy and Atmosphere: EA P3
        • Standard
          • Intent or Credit
          • Requirements
            • Requirements 2
            • Requirements 3
          • Strategy
            • Strategy 2
          • Submittal Documentation
            • Submittal Documentation Continued
    • Environmental Quality Models
      • Environmental Quality: EQ C1
        • Standard
          • Intent or Credit
          • Requirements
            • Requirements II
            • Requirements III
            • Requirements IV
            • Requirements V
          • Strategy
            • Strategy II
          • Submittal Documentation
            • Submittal Documentation II
            • Submittal Documentation III
      • Environmental Quality: EQ C2
        • Standard
          • Intent or Credit
          • Requirements
            • Requirements II
            • Requirements III
            • Requirements IV
          • Strategy
          • Submittal Documentation
            • Submittal Documentation II
      • Environmental Quality: EQ C3.1
        • Standard
          • Intent or Credit
          • Requirements
            • Requirements II
            • Requirements III
            • Requirements IV
          • Strategy
            • Strategy II
          • Submittal Documentation
      • Environmental Quality: EQ C3.2
        • Standard
          • Intent or Credit
          • Requirements
            • Requirements II
            • Requirements III
            • Requirements IV
            • Requirements V
            • Requirements VI
          • Strategy
            • Strategy II
            • Strategy III
            • Strategy IV
            • Strategy V
          • Submittal Documentation
            • Submittal Documentation II
            • Submittal Documentation III
      • Environmental Quality: EQ C4.1
        • Standard
          • Intent or Credit
          • Requirements
            • Requirements II
            • Requirements III
            • Requirements IV
            • Requirements V
          • Strategy
            • Strategy II
            • Strategy III
          • Submittal Documentation
      • Environmental Quality: EQ C4.2
        • Standard
          • Intent or Credit
          • Requirements
            • Requirements II
            • Requirements III
            • Requirements IV
          • Strategy
          • Submittal Documentation
      • Environmental Quality: EQ C4.3
        • Standard
          • Intent or Credit
          • Requirements
            • Requirements II
            • Requirements III
          • Strategy
          • Submittal Documentation
            • Submittal Documentation II
            • Submittal Documentation III
      • Environmental Quality: EQ C4.4
        • Intent or Credit
        • Requirements
          • Requirements II
        • Strategy
          • Strategy II
          • Strategy III
        • Submittal Documentation
      • Environmental Quality: EQ C5
        • Standard
          • Intent or Credit
          • Requirements
            • Requirements II
            • Requirements III
            • Requirements IV
            • Requirements V
            • Requirements VI
          • Strategy
            • Strategy II
            • Strategy III
            • Strategy IV
            • Strategy V
          • Submittal Documentation
            • Submittal Documentation II
            • Submittal Documentation III
      • Environmental Quality: EQ C6.1
        • Intent or Credit
          • Intent or Credit II
        • Requirements
          • Requirements II
          • Requirements III
        • Strategy
          • Strategy II
        • Submittal Documentation
          • Submittal Documentation II
          • Submittal Documentation III
      • Environmental Quality: EQ C6.2
        • Standard
          • Intent or Credit
            • Intent or Credit II
          • Requirements
            • Requirements II
            • Requirements III
            • Requirements IV
            • Requirements V
            • Requirements VI
          • Strategy
            • Strategy II
          • Submittal Documentation
            • Submittal Documentation II
            • Submittal Documentation III
      • Environmental Quality: EQ C7.1
        • Standard
          • Intent or Credit
          • Requirements
            • Requirements II
            • Requirements III
          • Strategy
            • Strategy II
            • Strategy III
            • Strategy IV
          • Submittal Documentation
            • Submittal Documentation
      • Environmental Quality: EQ C7.2
        • Standard
          • Intent or Credit
          • Requirements
            • Requirements II
            • Requirements III
          • Strategy
            • Strategy II
            • Strategy III
          • Submittal Documentation
            • Submittal Documentation II
      • Environmental Quality: EQ C8.1
        • Intent or Credit
        • Requirements
          • Requirements II
          • Requirements III
          • Requirements IV
          • Requirements V
          • Requirements VI
          • Requirements VII
        • Strategy
          • Strategy II
          • Strategy III
          • Strategy IV
        • Submittal Documentation
          • Submittal Documentation II
      • Environmental Quality: EQ C8.2
        • Intent or Credit
          • Intent or Credit
        • Requirements
          • Requirements II
          • Requirements III
        • Strategy
          • Strategy II
          • Strategy III
          • Strategy IV
        • Submittal Documentation
      • Environmental Quality: EQ P1
        • Standard
          • Intent or Credit
            • Intent or Credit
          • Requirements
            • Requirements II
            • Requirements III
            • Requirements IV
          • Strategy
            • Strategy II
            • Strategy III
          • Submittal Documentation
            • Submittal Documentation II
            • Submittal Documentation III
      • Environmental Quality: EQ P2
        • Standard
          • Intent or Credit
          • Requirements
            • Requirements II
            • Requirements III
          • Strategy
            • Strategy II
            • Strategy III
          • Submittal Documentation
            • Submittal Documentation II
    • Materials and Resources Models
      • Materials and Resources: MR C1
        • Intent or Credit
          • Intent or Credit II
        • Requirements
          • Requirement IV
          • Requirements II
          • Requirements III
        • Strategy
          • Strategy II
          • Strategy III
        • Submittal Documentation
          • Submittal Documentation II
          • Submittal Documentation III
      • Materials and Resources: MR C2
        • Intent or Credit
        • Requirements
          • Requirements II
          • Requirements III
          • Requirements IV
        • Strategy
          • Strategy II
          • Strategy III
          • Strategy IV
        • Submittal Documentation
          • Submittal Documentation II
          • Submittal Documentation III
      • Materials and Resources: MR C3
        • Standard
          • Intent or Credit
          • Requirements
            • Requirement IV
            • Requirements II
            • Requirements III
          • Strategy
            • Strategy II
            • Strategy III
          • Submittal Documentation
            • Submittal Documentation II
            • Submittal Documentation III
      • Materials and Resources: MR C4
        • Standard
          • Intent or Credit
          • Requirements
            • Requirements II
            • Requirements III
          • Strategy
            • Strategy II
            • Strategy III
          • Submittal Documentation
            • Submittal Documentation II
            • Submittal Documentation IV
      • Materials and Resources: MR C5
        • Standard
          • Intent or Credit
          • Requirements
            • Requirement IV
            • Requirements II
            • Requirements III
            • Requirements V
          • Strategy
            • Strategy II
            • Strategy III
          • Submittal Documentation
            • Submittal Documentation II
            • Submittal Documentation III
      • Materials and Resources: MR C6
        • Standard
          • Intent or Credit
          • Requirements
            • Requirements II
            • Requirements III
          • Strategy
            • Strategy II
            • Strategy III
          • Submittal Documentation
            • Submittal Documentation II
            • Submittal Documentation III
      • Materials and Resources: MR C7
        • Standard
          • Intent or Credit
          • Requirements
            • Requirements II
            • Requirements III
            • Requirements IV
          • Strategy
            • Strategy II
            • Strategy III
          • Submittal Documentation
            • Submittal Documentation II
      • Materials and Resources: MR P1
        • Intent or Credit
        • Requirements
          • Requirements II
          • Requirements III
          • Requirements IV
        • Strategy
          • Strategy II
        • Submittal Documentation
          • Submittal Documentation II
    • Sustainable Sites Models
      • Sustainable Sites: SS C1
        • Standard
          • Intent or Credit
          • Requirements
            • Requirements II
            • Requirements III
          • Strategy
            • Strategy II
          • Submittal Documentation
            • Submittal Documentation II
            • Submittal Documentation III
      • Sustainable Sites: SS C2
        • Intent or Credit
        • Requirements
          • Requirements II
          • Requirements III
        • Strategy
          • Strategy II
        • Submittal Documentation
          • Submittal Documentation II
          • Submittal Documentation III
      • Sustainable Sites: SS C3
        • Standard
          • Intent or Credit
          • Requirements
            • Requirements II
            • Requirements III
          • Strategy
            • Strategy II
          • Submittal Documentation
            • Submittal Documentation II
      • Sustainable Sites: SS C4.1
        • Intent or Credit
        • Requirements
          • Requirements II
        • Strategy
          • Strategy II
          • Strategy III
        • Submittal Documentation
          • Submittal Documentation II
      • Sustainable Sites: SS C4.2
        • Intent or Credit
        • Requirements
          • Requirements II
          • Requirements III
        • Strategy
          • Strategy II
        • Submittal Documentation
          • Submittal Documentation II
          • Submittal Documentation III
      • Sustainable Sites: SS C4.3
        • Standard
          • Intent or Credit
          • Requirements
            • Requirements II
            • Requirements III
            • Requirements IV
            • Requirements V
          • Strategy
            • Strategy II
            • Strategy III
          • Submittal Documentation
            • Submittal Documentation II
            • Submittal Documentation III
      • Sustainable Sites: SS C4.4
        • Intent or Credit
        • Requirements
          • Requirements II
          • Requirements III
          • Requirements IV
        • Strategy
          • Strategy II
        • Submittal Documentation
          • Submittal Documentation II
          • Submittal Documentation III
      • Sustainable Sites: SS C5.1
        • Standard
          • Intent or Credit
          • Requirements
            • Requirements II
            • Requirements III
          • Strategy
            • Strategy II
            • Strategy III
            • Strategy IV
            • Strategy V
          • Submittal Documentation
            • Submittal Documentation II
            • Submittal Documentation III
      • Sustainable Sites: SS C5.2
        • Intent or Credit
        • Requirements
          • Requirements II
          • Requirements III
          • Requirements IV
        • Strategy
          • Strategy II
          • Strategy III
        • Submittal Documentation
          • Submittal Documentation II
          • Submittal Documentation III
      • Sustainable Sites: SS C6.1
        • Standard
          • Intent or Credit
          • Requirements
            • Requirements II
            • Requirements III
          • Strategy
            • Strategy II
          • Submittal Documentation
            • Submittal Documentation II
            • Submittal Documentation III
      • Sustainable Sites: SS C6.2
        • Standard
          • Intent or Credit
          • Requirements
            • Requirements II
            • Requirements III
          • Strategy
            • Strategy II
          • Submittal Documentation
            • Submittal Documentation II
            • Submittal Documentation III
      • Sustainable Sites: SS C7.1
        • Standard
          • Intent or Credit
          • Requirements
            • Requirements II
            • Requirements III
          • Strategy
            • Strategy II
          • Submittal Documentation
            • Submittal Documentation II
            • Submittal Documentation III
      • Sustainable Sites: SS C7.2
        • Standard
          • Intent or Credit
          • Requirements
            • Requirements II
            • Requirements III
            • Requirements IV
          • Strategy
            • Strategy II
            • Strategy III
          • Submittal Documentation
            • Submittal Documentation II
            • Submittal Documentation III
      • Sustainable Sites: SS C8
        • Standard
          • Intent or Credit
          • Requirements
            • Requirements II
            • Requirements III
            • Requirements IV
            • Requirements V
            • Requirements VI
          • Strategy
            • Strategy II
          • Submittal Documentation
            • Submittal Documentation II
            • Submittal Documentation III
      • Sustainable Sites: SS P1
        • Standard
          • Intent or Credit
          • Requirements
            • Requirements II
            • Requirements III
            • Requirements IV
          • Strategy
            • Strategy II
          • Submittal Documentation
            • Submittal Documentation II
            • Submittal Documentation III
    • Water Efficiency Models
      • Water Efficiency: Prerequisite 1
        • Standards: None
          • Intent or Credit
          • Requirements
            • Commercial
            • Residential
          • Strategy
            • Exclusions
          • Submittal Documentation
            • Submittal Documentation Continued
      • Water Efficiency II
        • Standard: None
          • Intent or Credit
          • Requirements
            • Factors
            • Variables
          • Strategy
            • Results
          • Submittal Documentation
            • More Documentation
      • Water Efficiency III
        • Standard: None
          • Intent or Credit
          • Requirements
            • Alternative
          • Strategy
            • Stategy Continued
          • Submittal Documentation
            • Further Documentation
      • Water Efficiency IV
        • Standard: None
          • Intent or Credit
          • Requirements
            • Option 2
          • Strategy
            • Continued Strategy
          • Submittal Documentation
            • Documentation Continued
            • Further Documentation
      • Water Efficiency V
        • Standard: Energy Policy Act (EPAct) of 1992
          • Intent or Credit
          • Requirements
            • Commercial
            • Residential
          • Strategy
          • Submittal Documentation
            • Documents Continued
            • Final Documentation
      • Water Efficiency VI
        • Standard
          • Intent or Credit
          • Requirements
            • Calculations
            • Final Calculations
            • Further Calculations
          • Strategy
            • Goals
          • Submittal Documentation
            • Continued Documentation
            • Final Documentation
  • Cal Green
    • Glossary
      • ASHRAE 189
      • Collaborative for High Performing Schools
      • Core Performance Guide
      • Earth Advantage
      • EarthCraft
      • ENERGY STAR®
      • Green Points Rating System
      • Home Energy Rating System
      • ICC-700-2008 National Green Building Standard, 2008
      • International Green Construction Code
      • LEED
      • NAHB Green Guidelines
  • Cal Green Video Tutorials
    • ASHRAE
    • Collaborative High Performance Schools
    • Core Performance Guide
    • Earth Advantage
    • Earth Craft
    • Energy Star
    • Green Points Rating
    • HERS
    • Intro
    • LEED
    • NAHB
  • Video Seminar
    • 2010 California Green Building Standards Code
    • Basics of Cal Green 2010
    • CalGreen Building Standards Code
    • California Green Code
    • Choice of Materials
    • Code vs. Voluntary
    • Contradiction with the Commission’s Nine-Point Criteria
    • Differences Between the California Green Building Standards Code and Point-Based Systems
    • Draft Cal Green 2010
    • Green Building Requirements
    • ICC-700-2008 National Green Building Standard, 2008
    • Intent
    • International Green Construction Code
    • Introduction
    • LAMPO Green Code
    • Locally Developed Programs
    • Mandatory Non-Residential Planning and Design
    • Mandatory VS. Voluntary Measures
    • Non Residential Voluntary Tier 1
    • Non Residential Voluntary Tier 2
    • Non-Residential Mandatory
    • Planning and Design Voluntary
    • Residential Mandatory
    • Residential Voluntary Tier 1
    • Standard 189 Integrated into New Green Construction Code
    • Steel Framing
    • The Calgreen Code
    • The Los Angeles Green Building Ordinance VS. California’s Other Green Cities
    • Unenforceable Sections
    • Why Develop a Green Code?
LEED » Materials and Resources Models » Materials and Resources: MR P1 » Intent or Credit

Intent or Credit

 Add comments
 

Facilitate the reduction of waste generated by building occupants that is hauled to and disposed of in landfills. Reduce waste stream to landfills

 Posted by Greenerade at 8:14 pm

 Leave a Reply

You must be logged in to post a comment.

My Tweets

© 2013 Greenerade Suffusion theme by Sayontan Sinha