Greetings to future Architects.
Commit
Do not go half way
Study what is common in Venn diagram
Pass it and move to next one
Greetings to future Architects.
Commit
Do not go half way
Study what is common in Venn diagram
Pass it and move to next one
Greetings,
Future Architects.
Study Steady.
Study Hard.
Understand and feel the subject.
You will Pass
Cheers
What Architects Need to Know for 2018 T24 and New Green Codes Possible Legal Cases …
First Greetings, happy Holidays, Merry Christmas to All.
Next week session will be uploaded separately.
The site will give warning prior to download. Skip and go through for final download.
If not, email me and I will send directly.
My experience in legal issues and practicing with the Green Code and Title-24 provided many good examples for you and your firm to ponder.
Note, you design, you specify, you take the liability.
Always send me a note on issues that concerns you on any similar matters.
Dr. Nour
Download File:[download id=”25″]
Saum 200 page Fluid Notes- Part IV
This was last of 200 pages.
I will post more.
Good luck and study hard.
Saum
Greetings for future Engineers,
This is my lecture notes for those studying for these exams.
If you see errors, please correct and scan and email them to snour@absoluteco.com
Do not take any test lightly.
I will upload all my 12 ft of lecture notes in this blog.
Here Part I o the Hyperlink.
Saum 200 page Fluid Notes- Part I
Good Luck and Pass the test.
Dr. K. Nour, PE “Saum”
Greetings.
This part II.
Please note questions are formulated into sentences.
Incorrect responses are in red.
Part II to download
Let us know when you are a Full Architect.
Good Luck and Study Hard/
Saum
Greetings to Future Architects.
Attached is two part set of handouts.
“Saum’s House”
And ARE V4 series of study guide.
Good Luck.
Study Hard, and Prepare Well.
Saum
IAPMO Lectures: Santa Ana 7/13/2016 and Oceanside 8/2/2016
2015 Uniform Plumbing Code® Important Code Changes |
|
Chapter 2 | Definitions |
204 | Bottle Filling Station and 206.0 Drinking Fountain |
220 | Registered Design Professional |
Chapter 3 | General Regulations |
312.6 | Freezing Protection |
312.14 | Ex posed PVC Piping |
314.1 | Trenches |
314.4 | Excavations |
320 | Rehabilitation of Piping Systems |
Chapter 4 | Plumbing Fixtures and Fixture Fittings |
407 | Lavatories |
412.1.1 | Nonwater Urinals |
413 | Flushing Devices |
415.2 | Bottle Filling Stations |
418.3 | Location of Floor Drains |
421 | Floor Sinks |
Chapter 5 | Water Heaters |
501.1 | Applicability, 505.1Water Heaters, and 505.4 Indirect-Fired Water Heaters |
505.4.1 | Single-Wall Heat Exchanger |
507.5 | Drainage Pan |
320.1 | 320.1 Pipe, Tube, and Fittings and 605.9.1 Fittings |
320.2 | 320.2 Lead Content |
Chapter 6 | Water Supply and Distribution |
606.5 | Control Valve |
608.3 | Expansion Tanks and Combination Temperature and Pressure-Relief Valves |
612 | Residential Fire Sprinklers |
Chapter 7 | Sanitary Drainage |
707.4 | Location |
707.9 | Clearance |
710.4 | Discharge Line |
Chapter 8 | Indirect Waste |
814 | Condensate Wastes and Disposal |
Chapter 9 | Vents |
906.3 | Use of Roof |
908.2 | Horizontal Wet Venting for a Bathroom Group |
911 | Circuit Venting |
Chapter 10 | Traps and Interceptors |
1009.1 | Where Required |
Chapter 12 | Fuel Gas Piping |
1208.5.9.2 | Gas Joints, Pressure Regulators, and Valves |
1208.7 | Gas Joints, Pressure Regulators, and Valves |
1212.5 | Gas Joints, Pressure Regulators, and Valves |
1212.8 | Sediment Trap |
Chapter 13 | Health Care Facilities and Medical Gas and Medical Vacuum Systems |
1303.8 | Water Supply for Hospitals |
Chapter 15 | Alternate Water Sources for Nonpotable Applications |
1501.2 | System Design |
407 | Inspection and Testing |
408 | Separation Requirements |
1504.7 | On-Site Treated Nonpotable Water Devices and Systems |
Chapter 16 | Nonpotable Rainwater Catchment Systems General Changes |
1602.6 | Sizing |
1602.9.3 | Rainwater Catchment System Surfaces |
1902.9.5.8 | Storage Tank Venting |
1602.11.1 | Supply System Inspection and Test |